NORDGRYD
RESOURCES · THE MTTR MEMO

Notes from the NOC.

FEATURED · 14 MIN READ

A field note: cutting rural tower response time from 9h to 4h 27m

By Adaeze Okafor · 03 May 2026
Read article →
SUBSCRIBE

The MTTR Memo

Monthly notes on running infrastructure, from operators to operators. No hype.

[ ENGINEERING ]
Engineering

How we route tickets in 80 milliseconds

12 min 01 May 2026
[ ENGINEERING ]
Engineering

Postgres at the multi-tenant edge

17 min 08 Apr 2026
[ ENGINEERING ]
Engineering

Why we left amber behind

7 min 08 Mar 2026